Wake up charged. Every day.
A Level 2 charger turns your garage into the cheapest, most convenient "fuel station" in Denver. We install them load-calculated, permitted, and tidy.
Level 2 — wake up charged
More than mounting a box on the wall
- Load calculation — confirm your panel can carry it (or plan the upgrade honestly)
- Dedicated 240V circuit sized for your charger and car
- Clean conduit runs and a mounting position that suits how you actually park
- Permit and inspection handled
- Charger configured, tested, and demonstrated before we leave
- Hardwired or plug-in (NEMA 14-50) — we’ll recommend what fits your setup
Home garages to office lots
Homeowners
Single charger in the garage or on the driveway side — the classic overnight setup.
Workplaces & retail
Employee and customer charging with load management so the building’s service isn’t the bottleneck.
HOAs & property managers
Shared-parking solutions with metering and phased rollout plans that boards can actually approve.
EV charging questions, answered straight
Which charger brands do you install?
Any major Level 2 unit — Tesla Wall Connector, ChargePoint, Emporia, Wallbox, and the rest. Already bought one? We’ll install it. Haven’t? We’ll recommend without markup games.
Can my panel handle a charger?
That’s the first thing we check. Many can — some need load management or a panel upgrade. You’ll get the honest answer and the options, in that order.
How long does installation take?
A straightforward garage install next to the panel is typically a short visit; longer runs and panel work add time. The quote spells out your specific case.
Do I need a permit for this?
Yes — a new 240V circuit is permit work in the Denver metro, and we handle it. It protects your insurance and resale story as much as your wiring.
Your garage, upgraded.
Tell us your car, your panel’s location, and where you park — that’s enough for a first read.